Power-On Commissioning - Huawei FusionModule800 Quick Manual

Smart small data center
Hide thumbs Also See for FusionModule800:
Table of Contents

Advertisement

Item
Check That
All cable joints are secured properly, especially the cable joints
between network cables.
Exposed parts near the wiring terminals and lugs are wrapped in
PVC insulation tape or heat shrinking tubing.
The flat washers and spring washers of all wiring terminals are
Cable
securely installed.
Cables are bound neatly and cable ties are secured evenly and
properly.
All labels at the cable ends are clear.
All ground cables are copper cables. Cable diameters are correct.
No switches or fuses are installed on the cables and no short circuit
occurs.
The ground cables, AC power cables, and internal cables are
correctly connected and screws are secured. No short circuit occurs
in power input or output.
The input voltage of smart cooling products is within the range of
rated voltage ±10%, and the input frequency is within the range of
rated frequency ±3 Hz.
The length of ground cables and power cables is correct.
Lugs for power cables and ground cables are welded or crimped
securely.
Electrical
Power cables and ground cables are routed and bundled separately
from other cables.
Batteries are free of damage, cracks, and bulge.
Batteries are clear and experience no leakage.
Wiring terminals of batteries are free of damage, break, and acid
leakage.
Battery safety valves remain intact and experience no acid leakage.
Batteries are connected correctly.
DIP switches on devices are correctly set.

Power-On Commissioning

Power-On Commissioning for the Power Supply and
1
Distribution System
Configure an upstream protective device that meets the overload and short-circuit protection
requirements for the Converged Cabinet. If one power input is overloaded or short-circuited,
the system can switch to the other power input automatically.
PDUs for Asia, Europe, and Africa (3 U, 6 U, 9 U, and 10 U) and for Latin America (9 U) are
available for the power distribution subrack of the Converged Cabinet.
1. Switch on all SPD circuit breakers.
50
Check Result
□ Passed
□ Failed
□ Passed
□ Failed
□ Passed
□ Failed
□ Passed
□ Failed
□ Passed
□ Failed
□ Passed
□ Failed
□ Passed
□ Failed
□ Passed
□ Failed
□ Passed
□ Failed
□ Passed
□ Failed
□ Passed
□ Failed
□ Passed
□ Failed
□ Passed
□ Failed
□ Passed
□ Failed
□ Passed
□ Failed
□ Passed
□ Failed
□ Passed
□ Failed

Advertisement

Table of Contents
loading

Table of Contents