Huawei FusionModule800 Quick Manual page 48

Smart small data center
Hide thumbs Also See for FusionModule800:
Table of Contents

Advertisement

9
Management System Cable Connection
9.1
Connecting Cabinet Electronic Clasp Lock Cables
9.2
Connecting VCN Cables
(1) Ground terminal
1. Connect one end of the ground cable to the grounding terminal of the device and the other
end to the grounding point of the network cabinet.
2. Connect one end of the network cable to any GE network port on the VCN510.
3. Connect one end of the power cable to the power input port on the power module and the
other end to the PDU2000 in the cabinet.
9.3
Connecting a Monitoring Cable to the Smart ETH Gateway
(1) PWR_IN cascading
power port
(5) 48V_OUT1 power
output port
(9) BLINK button
(2) GE1 port
(3) GE2 port
(2) FE_1 cascading signal
port
(6) 48V_OUT2 power
output port
(10) Status indicator
(4) Power button
(3) PoE_1–2 ports
(7) FE_2 cascading
signal port
47
(5) Power port
(4) PoE_3–4 ports
(8) PWR_OUT
cascading power port

Advertisement

Table of Contents
loading

Table of Contents