Huawei FusionModule800 Quick Manual page 46

Smart small data center
Hide thumbs Also See for FusionModule800:
Table of Contents

Advertisement

5
(Optional) Connecting Cables to the ATS Subrack
Power cables of
input II to the ATS
Power cables of
input I to the ATS
Connect the
ground cable
first.
6
Connecting Power Cables to the Converged Cabinet
6.1
Top Cable Routing
Asia, Africa, and Europe
Connecting output power cables to the
PDU (for the IT cabinet)
Connecting input power cables to the PDU
Connecting output power cables to the PDU
(for the indoor and outdoor units of the
smart cooling product)
45
Output power
cables from the
ATS to the
Converged
Cabinet

Advertisement

Table of Contents
loading

Table of Contents