8
Installing Water Pipes
8.1
Installing Water Inlet Pipes
(1) Reserved connector
(2) Active connector
(3) Rigid pipe
(4) Elbow
(5) Rigid pipe
Upward water inlet pipe routing
After routing water pipes, secure them to the refrigerant pipes using cable ties. If the pipes are
routed downwards, not only secure the pipes but also seal the cable hole using firestop putty.
Downward water inlet pipe routing