Huawei FusionModule800 Quick Manual page 62

Smart small data center
Hide thumbs Also See for FusionModule800:
Table of Contents

Advertisement

Setting Parameters on the VCN
IVS Client
1. Install the VCN IVS client.
2. Add a camera. For details, see the
documentation delivered with the
equipment or obtain the documentation
by referring to the "Preparing
Documentation" section. View the
corresponding section.
3. Configure a video recording plan.
4. Create a user.
3.13
FusionModule800 Linkage Control
Linking the Emergency Ventilation
with Cabinet Electronic Clasp Lock Open
1. Log in to the ECC800 WebUI as an
administrator.
2. Choose System Settings > Linkage
Control.
3. Ensure that Enable linkage control
function is Yes.
4. On the Linkage Group tab page, set Link
emergency ventilation with clasp lock
open to on.
Linking the Fire Control with Cabinet
Electronic Clasp Lock Open
1. Log in to the ECC800 WebUI as an
administrator.
2. Choose System Settings > Linkage
Control.
3. Ensure that Enable linkage control
function is Yes.
4. On the Linkage Group tab page, set Link
fire control with Cabinet Electronic Clasp
lock open to on.
5. Modify the AI/DI_2 signal name.
6. Enable the AI/DI device.
3.15
(Optional) Edge Data Center Management Solution
For commissioning details, see the documentation for the edge data center management
solution.
Setting Parameters on the VCN WebUI
For details about the VCN hardware description
and installation, see the "Hardware Guide" in
the corresponding VCN product documentation.
For details about the VCN configuration, see
Configuration Guide
1. Modify the IP address for the VCN.
2. Enable camera NTP synchronization.
Linking the Smoke Alarm with
Cabinet Electronic Clasp Lock Open
1. Log in to the ECC800 WebUI as an
administrator.
2. Choose System Settings > Linkage
Control.
3. Ensure that Enable linkage control
function is Yes.
4. On the Linkage Group tab page, set
Link smoke alarm with Cabinet
Electronic Clasp lock open to on.
5. Modify the AI/DI_1 signal name.
6. Enable the AI/DI device.
3.14
(Optional) NetEco Management
1. Connect the communications cable.
2. Set NetEco parameters.
3. Obtain the NetEco software license.
4. Power on the server.
5. Log in to the NetEco client.
6. Load the license.
7. Install the NE mediation.
8. Create a management domain.
9. Add a smart module.
10.Create an ECC800 on the NetEco.
For details, see the
Small Data Center V100R001C20 User Manual
Huawei Technologies Co., Ltd.
Huawei Industrial Base, Bantian, Longgang
Shenzhen 518129 People's Republic of China
61
.
FusionModule800 Smart
www.huawei.com
.

Advertisement

Table of Contents
loading

Table of Contents