Installing Batteries

1. Install batteries.
The battery appearance and layout
shown in the figure are for reference
only. The actual battery appearance
and battery wiring diagram prevail.
2. Connect battery cables.
Short cable connection
Long cable connection
12.2
Connecting Circuit Breaker Cables
Before connecting cables, ensure that
the circuit breaker is OFF.
MCCB cable connection
1. Connect cables to MCCB 1.
a. Remove the panel from the BCB box.
b. Connect the +, N, and – cables to the UPS
terminals, as shown by (1) in the figure.
c. Connect the +, N, and – cables to the
battery terminals, as shown by (2) in the
figure.
Circuit
breaker
Battery
Tray
Incorrect connection