Csm Flash Card Removal And Replacement; Odu Removal And Replacement - Alcatel-Lucent 9500 MPR User Manual

Microwave packet radio
Hide thumbs Also See for 9500 MPR:
Table of Contents

Advertisement

5.5.2

CSM Flash Card Removal and Replacement

In a Protected system, reboot for both Main and Spare Flash
Cards can take up to 15 minutes. The flashing status green
LED indicates reboot in progress. Status LED turns solid
green at completion of reboot.
For a Not Protected system, reboot for the Main Flash Card
will take up to three minutes.
Verify the replacement Flash Card being installed on the CSM meets the following com-
patibility rules:
• Main Flash Card (in slot 1) and Spare Flash Card (in slot 2) must be the same .
• Local and far end Flash Cards must be the same.
5.5.3

ODU Removal and Replacement

Exposure to energy radiated at microwave frequencies can cause eye
injury and eventual blindness. Do not look directly into any untermi-
nated waveguide port.
Failure to disconnect power to the ODU by disconnecting the associated
MD300 module from the MSS backplane can result in damage to the
MD300 module and can cause damage to the ODU.
5-18
CAUTION
Possibility of
Service
Interruption
WARNING
Possibility of
Damage
to Equipment
WARNING
Possibility of
Damage
to Equipment

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

9500 mpr-a

Table of Contents