To complete the system installation for a Suzuki SPC engine you need to:
1. Install the Suzuki control head (refer to installation instructions
provided by Suzuki)
2. Install the Optimus EST gateway (section 6.1)
3. Complete the CAN network connections (section 6.2)
4. Configure the gateway (section 6.3)
5. Calibrate the system using the Suzuki Diagnostic Software tool
(section 6.4)
Once you've completed these steps you can move on to the sea trial
(Book 65) and then to the joystick setup (Book 65).
6.1 Gateway installation
The EST gateway is an electronic interface device that connects the Optimus
control system to the OEM shift and throttle control system. It passes shift
and throttle commands from the joystick to the OEM EST system, and
monitors station selection, network status and ignition state.
Location
One gateway (EG1810) is required at the main control station. It should be
installed underneath the dash and in close proximity to the control head.
Section 6.2 details the required connections.
Installation
Install the gateway with the strain relief plate and screws as shown in figure
6-1. The preferred orientation is vertical with connections facing down, but
it may also be installed horizontally. Avoid mounting the gateway with the
connections facing upwards.
STRAIN RELIEF
PLATE
Figure 6-1 Gateway with strain relief plate.
EST GATEWAY
2 X LONG
SCREWS
(NOT SUPPLIED)
2 X SHORT SCREWS
(NOT SUPPLIED)
6-1