Part 1 – Component installation
Components may be installed in any order. Table 3-1 shows where the
installation information can be found for each component.
Component
Steering Helm
CANtrak Display
Hydraulic Pumps
SmartCylinders
Steering Service Valves
System Plumbing
Base (EPS) System Wiring
Joystick
Control Head (by Yanmar)
Control Head (by others)
360 System Wiring
Table 3-1. Component list and installation references.
3.2.2
Part 2 – System calibration, purging and setup
(Section 4.0)
The system calibration, purging and setup must be done in the correct
order as defined in Table 3-2.
Step Description
1
Initial Setup
2
Purging Steering
System
3
Calibration
4
Control Head and
Gateway Setup
5
Sea Trial
6
Joystick Setup
Table 3-2. System setup order of operations.
Reference Document
Optimus EPS Installation Manual (Book 50.1)
Optimus EPS Electronic Power Steering with
Electric Actuator Installation and User's
Manual (Book 54)
This document (Section 3.3)
This document (Section 10.1)
Refer to engine manufacturer's
documentation
This document (Sections 3.4, 3.5, and
engine manufacturer-specific sections )
Reference Document
This document (Section 4)
Optimus EPS Installation Manual (Book 65)
Optimus EPS Installation Manual (Book 50.1)
Optimus EPS Electronic Power Steering with
Electric Actuator Installation and User's
Manual (Book 54)
This document (manufacturer-specific
sections 5-8)
Optimus EPS Installation Manual (Book 65)
This document (Section 9)