Download Print this page

Mandik FDMB Manual page 77

Fire dampers
Hide thumbs Also See for FDMB:

Advertisement

Installation frame E6 is suitable for:
● Installation outside solid wall/ceiling construction with cement lime plates
On the inside is installation frame equipped by intumescent sealing. It enlarges its capacity and air
proofs the gap between installation frame and damper body.
● Installation frame:
● Fasteners:
● a x b = (A +100 mm) x (B +100 mm)
≥ 100
≤ 300
≤ 300
Screw
(min. 4x80)
Screw
20
(min. 4x80)
20
≤ 300
≤ 300
POSITION:
1
Damper with installation frame E6
2
Cement lime plates min. thickness 40 mm
(min. density 450 kg/m )
3
Cement lime prisms min. thickness 40 mm
(min. density 450 kg/m )
* min. 110 - Concrete/ min. 125 - Aerated concrete
cement lime plates
galvanized plate
80
40
20
40
Screw
40
(min. 4x80)
40
≤ 300
≤ 300
Screws has to be fixed in wall/ceiling con-
struction. (If it is needed use steel bracket).
150*
≤ 300
20
20
≤ 300
Screw
20
(min. 4x80)
20
≤ 300
≤ 300
76
Screw
(min. 4x80)
Screw
40
(min. 4x80)
40
≤ 300
≤ 300

Advertisement

loading