Download Print this page

Mandik FDMB Manual page 76

Fire dampers
Hide thumbs Also See for FDMB:

Advertisement

Installation frame E5 is suitable for gypsum wall construction with ceiling movement possibility. Distance
of movement "x".
On the inside and outside is installation frame equipped by intumescent sealing. It enlarges its capacity
and air proofs the gap between damper body and installation frame and between installation frame and
wall construction.
Damper position:
● Directly on the ceiling
● In distance from ceiling max. 80 mm
● Installation frame:
● Fasteners:
Ceiling sag
Fitting with threaded rods or steel bracket
cement lime plates
galvanized plate
Ceiling sag
B+85
75
● For ceiling movement ≥10 mm
B+85
POSITION:
1
Fire damper FDMB with installation frame E5
2
Cement lime filling min. density 450 kg/m
3
Ceiling movement: construction thickness 100 mm
4
Extension part
5
Suspension
X = Ceiling movement (max. 40 mm)
Y = Distance of movement (max. 80 mm)

Advertisement

loading