Download Print this page

Mandik FDMB Manual page 48

Fire dampers
Hide thumbs Also See for FDMB:

Advertisement

≥ 50**
≥ 25
≤ 300
≥ 25
≤ 300
Screws has to be fixed in wall/ceiling construction. (If it is
needed use steel bracket).
≥ 50
POSITION:
1
Fire damper FDMB
2
Solid ceiling construction
3
Stuffing box (mineral stone wool min. density 140 kg/m )
4
Fire protection mastic min. thickness 1 mm
5
Cement lime plate min. thickness 15 mm (min. density
870 kg/m )
3
6
Duct
≥ 50**
** Around the perimeter
150*
Screw
≥ 25
(min. 4x50)
≥ 25
≤ 300
≥ 40
150*
3
47
Screw
≤ 300
(min. 4x50)
* min. 110 - Concrete/ min. 125 - Aerated concrete
Used materials - example**:
3 -
Promapyr, Rockwool Steprock HD
4 -
Promastop - P, K
5 -
Promatect - H
** Stuffing box, fire protection mastic, cement lime plate
and insulation materials can be replaced by another
approved fire sealing system for damper installation
with equivalent material properties.

Advertisement

loading