Step 35: Attach Roof Assemblies to Fort
Part 1
A: With 2 people on the ground and at least 1 person in the fort, lift the Large Roof Assembly up and over the
Back side of the fort. Guide the Large Roof Assembly onto the Swing Wall side of the fort so all four (320) Roof
Supports sit flush to the front and outside edges of (290) Roof End, (291) Roof End Left and both (310) Mid Roof
Ends. (fig. 35.1 and 35.2)
B: Attach (320) Roof Supports to (290) Roof End and (291) Roof End Left with 1 (S3) #8 x 2-1/2" Wood Screw
per support. (fig. 35.2)
Fig. 35.2
320
Flush
Each
310
Side
Large Roof
Assembly
S3
2 x
S3
Fig. 35.1
320
291
Flush
Hardware
#8 x 2-1/2" Wood Screw
70
Back
S3
Flush
290
Swing
Wall