Siemens LMV37.4 Series Basic Documentation page 87

Basic unit with integrated air-fuel ratio control for forced draft burners
Hide thumbs Also See for LMV37.4 Series:
Table of Contents

Advertisement

Building Technologies Division
Industry Sector
Indices
1)
Parameter:
2)
Only with valve proving during startup
3)
Parameter:
4)
If signal is faulty in the startup phase, phase 10 is next, otherwise phase 70
5)
Max. time safety phase, then lockout
6)
Time from occurrence of start prevention to signaling
7)
Only in case of valve proving during startup (valve proving via pressure
switch-min)
8)
Only in case of startup without valve proving (valve proving via pressure
switch -min)
9)
Inverse logic in case of valve proving via pressure switch-min
10)
Parameter 276:
11)
Only with fuel train Lo and 2 fuel valves
12)
Parameter 223:
13)
Max. drop-in/response time for air pressure switch
14)
Alternative to valve proving
15)
Alternative to pressure switch-max (Pmax) or POC
16)
Parameter 286:
Abbreviations
AL
Alarm
FS
Flame signal
GM
Fan motor contactor
LP
Air pressure switch
M
Fan motor
P LT
Pressure switch for valve proving
Pmax
Pressure switch-max
Pmin
Pressure switch-min
POC
Proof of closure
PV
Pilot valve
R
Temperature or pressure controller
SB
Safety limiter
SK
Safety loop
STB
Safety limit thermostat
SV
Safety valve
WM
Water shortage
V1
Fuel valve 1
V2
Fuel valve 2
VP
Combustion pressure switch
Z
Ignition transformer
SA
Actuator
SA-K
Low-fire position of actuator
SA-N
Postpurge position of actuator
SA-R
Home position of actuator
SA-V
Rated load position of actuator
SA-Z
Ignition load position of actuator
Basic documentation LMV37.4...
7 Basic unit
Short/long prepurge time for oil only
Short/long on time of oil pump – time
With/without alarm in the event of start prevention
Oil pressure min-input
1 = active from phase 38
2 = active from safety time
Repetition limit value gas pressure switch-min in connection
with gas shortage program parameter 246 (phase 90)
Evaluation of heavy oil direct start
0 = only start signal in phase 38
1 = evaluation in phase 38...62
87/235
CC1P7546en
20.09.2013