Update; Updating With Automation Studio And Usb Flash Drive - B&R Power Panel T80 User Manual

Table of Contents

Advertisement

Configuration

6.2 Update

When updating the Power Panel with a USB flash drive, it is important to note that the drive must have a capacity of
at least 256 MB. In addition, an industrial-grade USB flash drive must be used (see

6.2.1 Updating with Automation Studio and USB flash drive

1
Upgrade PPT Image in Automation Studio
1. Update the PPT image for the Power Panel in Automation Studio (upgrade).
2. Configure the Power Panel in Automation Studio according to requirements.
3. Connect a USB flash drive to the computer and select the following menu command in Automation Studio:
° Project / Project installation / Generate project installation package
The corresponding device (Power Panel) must be selected in the following selection dialog box. After con-
firming the selection, the target medium (connected USB flash drive) is selected and the process is started
using button [Download to application memory].
The USB flash drive is reformatted and the following data is copied to the root directory:
PPT system
• PPT80Image.img.gz
• PPT80Image.info
• PPT80Image.img.gz.sig
Depending on the configuration, files PPTLogo.bmp.gz and PPTLogoA.gif may not be included.
4. Connect the USB flash drive to the Power Panel.
70
4
5
Power Panel
Configuration
• PPT80Config.xml
"Storage media" on page
Automation Studio
2
USB memory
Boot logo/animation
• PPTLogo.bmp.gz
• PPTLogoA.gif
Power Panel T80 User's manual V1.03
110).
3

Advertisement

Table of Contents
loading

Table of Contents