Figure 3-15. Ac Management Cable Location - Nortel Versalar 15000 Installing And Maintaining

Switch router
Hide thumbs Also See for Versalar 15000:
Table of Contents

Advertisement

Installing and Maintaining the Versalar Switch Router 15000
AC
management
cable
SW1
Figure 3-15.
AC Management Cable Location
Insert the power plugs on the back of the separate AC power unit into the
7.
appropriate power outlet. (See Table 2-5 on page 2-8). Each power supply
requires one power cord.
Turn the AC POWER A and AC POWER B power breakers on the front
8.
panel of the separate AC power unit to the on (1) position.
Turn on the DC output switch on the right side of the unit front panel.
9.
3-26
External AC power supply
Grounding
Groundin
stud
wire
VRS
308684-B Rev 00

Advertisement

Table of Contents
loading

Table of Contents