Installing The Top Cable-Management Bracket - Nortel NN46205-310 Quick Start Manual

Ethernet routing switch
Table of Contents

Advertisement

38 Installation
Step
1
2
3

Installing the top cable-management bracket

Install the top cable-management bracket to the 8010co chassis.
Procedure steps
Step
1
2
3
Copyright © 2008 Nortel Networks
.
Action
Loosen, but do not remove, the rack-mounting screws required
to install a cable guide.
Slide the cable guide onto the loosened screws.
Tighten the screws to secure the cable guide to the chassis.
Action
Align the mounting retainers on the inside of the top
cable-management bracket with the holes on the front of the
chassis.
Push the sides of the top cable-management bracket into place.
Insert and tighten the eight screws using a Phillips screwdriver to
secure the top cable-management bracket to the chassis.
Nortel Ethernet Routing Switch 8600
Quick Start
NN46205-310 02.01 Standard
30 May 2008
--End--
--End--

Advertisement

Table of Contents
loading

This manual is also suitable for:

8600

Table of Contents