Installing and Maintaining the Versalar Switch Router 15000
Side view
Possible locations to reposition flanges (3)
Figure 2-7.
Repositioning the Vertical Flanges for Either a Two- or Four-Post Rack
2-18
Screws
(8 places)
Standard 4-post
rack position
Standard 2-post
rack position
Reversed 2-post
rack position
VRS0071A
308684-B Rev 00