User maintenance schedule
The following table describes maintenance activities that must be scheduled by customer
personnel. All maintenance that is not described in this manual must be performed by
a GE service engineer.
Frequency
Weekly
Annually
Annually and after
system relocation
As needed
1
If the instrument is used less than 12 times a year, the verification can be made annually.
Xcellerex XDM 50-1000, XDUO 100-1000 mixers Operating Instructions 29251615 AD
Activity
Clean the system
Change the TCU filter
Change the I/O Cabinet
vent filter
Verify agitator alignment
Inspect cables and con-
nectors
Inspect hinges and han-
dles
Inspect jacking bolts
Inspect pressure relief
assembly
Inspect pump heads
Inspect the I/O Cabinet
Inspect vent and drain
valves
Verify weight monitoring
functionality
Verify agitator speed ac-
1
curacy
Performed by
Operator
Properly trained person-
nel
GE service engineer
Properly trained person-
nel
Properly trained person-
nel
Properly trained person-
nel
Properly trained person-
nel
GE service engineer
8 Maintenance
8.2 Maintenance schedules
Reference
Section 8.5 Cleaning, on
page 257
See the manufacturer's
manual.
Contact your GE represen-
tative.
If anything abnormal is
found, contact your GE
representative for ser-
vice.
Inspect jacking bolts, on
page 259
If anything abnormal is
found, contact your GE
representative for ser-
vice.
Verify weight monitoring
accuracy, on page 261
Contact your GE represen-
tative.
251