GE Xcellerex XDM Series Operating Instructions Manual page 172

Table of Contents

Advertisement

6 Preparation
6.4 Prepare and install the probes
6.4.4 Insert probes into the disposable bag
Step
5
6
172
Action
Press the two ACD connectors together until they snap to closed position.
A double-click sound indicates that the connectors have been closed and
the ACDs are fully engaged.
Holding the bodies of both connectors with one hand, grip both white
membrane strips with the other hand and pull them (perpendicular to the
connectors) simultaneously away from the bodies of the connectors in one
smooth continuous motion.
Xcellerex XDM 50-1000, XDUO 100-1000 mixers Operating Instructions 29251615 AD

Advertisement

Table of Contents
loading

Table of Contents