GE Xcellerex XDM Series Operating Instructions Manual page 233

Table of Contents

Advertisement

Step
2
3
4
5
Xcellerex XDM 50-1000, XDUO 100-1000 mixers Operating Instructions 29251615 AD
Action
Make sure that the unused probe ports have been clamped, if you use a Plus
or Plus Flex bag assembly without the probes.
Make sure that the installed probes stay in place in the probe window during
the filling.
If your mixer has a weight monitoring option, monitor the weight of the
added liquid on the local control software home screen (XDUO mixer), or on
the weight monitor display (XDM mixer). Decrease the filling speed, when
the weight approaches the designated level.
Stop filling the bag when the designated liquid weight is reached.
7 Operation
7.4 Add liquid contents
233

Advertisement

Table of Contents
loading

Table of Contents