GE Xcellerex XDM Series Operating Instructions Manual page 126

Table of Contents

Advertisement

5 Installation
5.4 Connect temperature control unit
Step
4
5
6
126
Action
If available, use quick connect devices for the connections between the
tubing and the TCU. Lock the Snap-tite™ quick disconnect connector as
follows:
Pull back the locking ring.
a
Push both parts of the connector together.
b
Release the locking ring.
c
Result: The locking ring moves back and emits a click. The connector is locked.
Remove the reservoir cap on the TCU and and fill the reservoir with coolant.
Reinstall the cap and turn on the TCU.
Xcellerex XDM 50-1000, XDUO 100-1000 mixers Operating Instructions 29251615 AD

Advertisement

Table of Contents
loading

Table of Contents