GE Xcellerex XDM Series Operating Instructions Manual page 235

Table of Contents

Advertisement

Step
9
10
11
Xcellerex XDM 50-1000, XDUO 100-1000 mixers Operating Instructions 29251615 AD
Action
The lid of the 1000 L mixer has two center openings. Make sure that the
powder addition port is inserted into the opening as shown in the following
illustration.
Adjust the lines through the rectangular lid openings.
If needed, clamp the fill lines and disconnect the liquid source.
7 Operation
7.4 Add liquid contents
235

Advertisement

Table of Contents
loading

Table of Contents