GE Xcellerex XDM Series Operating Instructions Manual page 154

Table of Contents

Advertisement

6 Preparation
6.3 Prepare the disposable bag
6.3.2 Install the disposable bag
Step
2
3
Complete bag installation
If you are installing a Plus or Plus Flex bag assembly, insert the pH and conductivity
probes into the disposable bag. See Section 6.4 Prepare and install the probes, on page 157
for detailed instructions.
Follow the instructions below to finish the installation of the disposable bag assembly.
154
Action
Position the impeller baseplate correctly, as shown below.
CAUTION
Magnetic components. Use caution when handling
magnetic components. There is a strong magnetic at-
traction between the impeller and the motor drive
coupling.
Continue the bag installation as described in Start bag installation, on
page 147.
Xcellerex XDM 50-1000, XDUO 100-1000 mixers Operating Instructions 29251615 AD

Advertisement

Table of Contents
loading

Table of Contents