GE Xcellerex XDM Series Operating Instructions Manual page 179

Table of Contents

Advertisement

Completed probe sheath
installation
When the primary and secondary seals are in place and properly tightened, the probe
sheath assembly stays in the compressed condition against the internal pressure in the
disposable bag without the need of external fixtures. No additional measures are needed
to prevent the probe from sliding out of the disposable bag.
Install the temperature probe
Follow the instructions below to install the temperature probe into the disposable bag.
Step
1
Xcellerex XDM 50-1000, XDUO 100-1000 mixers Operating Instructions 29251615 AD
Action
Slowly and carefully remove the zip tie from the thermowell.
6.4 Prepare and install the probes
6.4.4 Insert probes into the disposable bag
6 Preparation
179

Advertisement

Table of Contents
loading

Table of Contents