Download Print this page

Mitsubishi Heavy Industries BD2GII Service Manual page 83

Advertisement

DISASSEMBLY AND REASSEMBL'~
Disassembly
Remove the following groups in the alphabetical order:
A Transmission control lever group
B Main drive shaft (input shaft) group
C Shift fork group
D Countershaft group
B Bevel gear shaft group
A Transmission control lever group, B Main drive shaft (input shaft) group
(Loosen
Al and A2.)
Al,A2 Hose
clamps
(Remove Al thru A7 as an assembly.)
A3
Cover
A4
Cover
A5 Retainer
A6 Spring
A7
Control lever
A8 Lever case
A9
Transmission cover
Disassembly sequence
Input
gar
2nd-speed reverse gear
Spacer
1st-speed reverse gear
Spacer
Ball
bearing
Input shaft
Snap ring
Ball bearing
•A3 Al
A 4
A9
602391
B16
602392
(Remove~Bl and B2 as an assembly.)
Bi
Flange
B2 Plug
(Remove B3 and B4 as an assembly.)
B3
Cover
B4
Oil seal
B5
Locknut
B6
Lock
washer
(Remove B7 thni B14 as an assembly.)
B7
Spacer
B8
B9
B 10
Bli
B 12
B13
B 14
B15
B16
83

Advertisement

loading

Related Products for Mitsubishi Heavy Industries BD2GII

This manual is also suitable for:

Bs3gii