Download Print this page

Mitsubishi Heavy Industries BD2GII Service Manual page 67

Advertisement

DISASSEMBLY AND REASSEMBLY
Removal sequence
1. Remove the following parts:
1
Engin~ hoo~
2 Side covers (both
sides)
3 Overflow hose, upper hoses lower hose
4 Oil cooler hoses (2 pcs)
5 Radiator
and
radiator
guard
6
Floor
plate
(platform)
7 Underguard
NOTE
To remove radiator guard
5
on
BD2GII-
PAT~
raise or lower the C-frame for access
2. Remove the following electric wires
and
parts on
and around
the engine:
8 Oil pressure
switch wire
9
Thermo
switch wire
10
Alternator wire
11 Hydraulic
rubber
hoses (2 pcs)
Before disconnecting the wires, markthem
for the components to.which they are to be
reconnected at the time of installq,tion.
12 Air cleaner indicator
wire
13 Glow plug wire
14 Stop solenoid
wire
15 Starter wire
16 Engine control cable.
17 Fuel hoses (2 pcs)
18 Ground wire
6
602371A
602372
602373A
67

Advertisement

loading

Related Products for Mitsubishi Heavy Industries BD2GII

This manual is also suitable for:

Bs3gii