Download Print this page

Mitsubishi Heavy Industries BD2GII Service Manual page 135

Advertisement

DISASSEMBLY AND REASSEMBLY
RECOIL CYLINDERS AND RECOIL SPRINGS
Removal and installation
Start by:
remove the cover, and gradually turn the fill
valve counterclockwise to~a1low grease to
escape from the vent hole:
Keep your face away from the fill valve
when adjusting or lloosealng the track.
The cylinder pressuriis released when
the front idler stops moving backward.
Removal sequence
1. Remove recoil cylinder guard 1:
2. Remove recoil cylinder assembly 2 by un
screwing mounting bolts (4 pcs).
I
Weight of hydraulic adjuster
15 kg (33 lb),
[~~inder assembly
approx.
3. Remove carrier roller bracket assembly (re
coil spring assembly) 3.
Weight of carrier roller brack1~ 42 kg (93 ib),
assembly (with carrier roller) :
J
approx.
~.
Remove the track carrier roller assembly.
(Refer to Removal, TRACK CARR~R
ROLLERS.)
Installation
To install, follow the reversepfremoval sequence.
Adjustment after installation
Adjust the tracks.
135

Advertisement

loading

Related Products for Mitsubishi Heavy Industries BD2GII

This manual is also suitable for:

Bs3gii