Download Print this page

Mitsubishi Heavy Industries BD2GII Service Manual page 27

Advertisement

SYSTEMS OPERATION
2. Prefihling of forward clutch piston chamber
Upon completion ofprefilling the 1st-speedclutcl~
piston chamber, the speed clutch pressure rises
beyond 2 kgf/cm2(28 psi) [0.2 MPa]. This pres
sure moves differential, valve 7 to the left end,
allowing the speed clutóh pressure oil to enter
forward clutch pressure port (CF) through inching
valve 8.
Since accumulator valve 1 does not move yet,
keeping main port 2 uncovered, the oil from the
pump flows into the forward clutch piston cham
ber without being metered.
25

Advertisement

loading

Related Products for Mitsubishi Heavy Industries BD2GII

This manual is also suitable for:

Bs3gii