Download Print this page

Mitsubishi Heavy Industries BD2GII Service Manual page 44

Advertisement

TESTING AND ADJUSTING
Pressure to be tested
Pressure tap
Pressure requirement
Main relief pressure
M (G 1/8", with 0-ring)
With engine running at high idle speed and
control lever kept in neutral, this pressure is
required to take the following value:
21 kgfJcm2 (299 psi) [2 MPa]
If not, replace main relief valve spring.
1st-speed, 2nd-speed
S (G 1/8", with 0-ring)
With engine running at high idle speed, this
and 3rd-speed clutch
pressure is required to remain at a level equal
pressure
to main relief pressure.
Forward and reverse
D (G 1/8", with 0-ring)
With engine running at high idle speed, this
clutch pressure
pressure is required to take the following value:
0 kgf/cm2 for both clutches with control lever in
..
neutral.
.
Not lower than main relief pressure by 2 kgf/cm2
(28 psi) [0.2 MPa], with control lever in 1st, 2nd
.
or 3rd speed position.
Shifting time
S (G 1/8", with 0-ring)
Measure time required for pressure to change
when control lever is shifted from neutral to any
position, or from one position to another.
.
Shifting
Time
N
—~-
1
1.0±0.3sec.
1
~
C~7+fl2
-~———
.
.
Sec.
-~
2
.~—
3
O.7±0.3sec.
G: Straight gas thread
Bench
test criteria for transmission oil pump
Direction of rotation
Clockwise (as seen from spline shaft side)
Hydraulic oil
Engine oil, SAB lOW
Oil temperature
50CC
± 5'C (122"F ± 9"F)
Discharge flow,
37.7 (10)/mi" at 2890 rpm, with engine
liter
(U.S.
gal)
running at 2300 rpm (rated speed)
39.3 (10.4)/mm at 3020 rpm, with engine
:
running at 2400 rpm (rated speed)
44

Advertisement

loading

Related Products for Mitsubishi Heavy Industries BD2GII

This manual is also suitable for:

Bs3gii