Coolant - Manitou MC 25-2 D K ST3A S1 Operator's Manual

Hide thumbs Also See for MC 25-2 D K ST3A S1:
Table of Contents

Advertisement

REPLACE
These operations are to be carried out as necessary or every two years at the beginning
of winter.
The engine does not contain any corrosion resistor and must be filled during the whole year with a mixture containing
- Place the lift truck on level ground with the engine stopped and cold.
- Open the engine cover (
- Remove the access panel 1.
DRAINING THE LIQUID
- Open the tap 2 to ensure good drainage.
- Place a container under hose 3.
- Undo the clamp 4 and remove the hose.
- Remove the filler plug 5 to ensure that the oil is drained properly.
- Let the cooling circuit drain entirely while ensuring that the ports do not get clogged.
- Check the condition of the hoses and their attachments, and change if necessary.
- Rinse the circuit with clean water, or use a cleaning agent if necessary.
FILLING WITH COOLANT
- Refit the hose 4 with its clamp 5.
- Close tap 3 again.
- Slowly fill the circuit with the coolant (
filling hole 6.
- Refit the filler plug 2.
- Run the engine at idle for a few minutes.
- Visually check that there is no leakage in the radiator and pipes.
- Check the level and refill if necessary.
IMPORTANT
25 % of ethylene glycol-based antifreeze.
COMMAND AND CONTROL INSTRUMENTS).
LUBRICANTS AND FUEL) through the

Coolant

3 - 27
www.duma-rent.com
1
2
3
4
5
6

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mc 25-4 d k st3a s1Mc 30-2 d k st3a s1Mc 30-4 d k st3a s1Msi 25 d k st3a s5Msi 30 d k st3a s5Msi 35 d k st3a s5

Table of Contents