Select Location For Controller; Gather Installation Tools; Gather Installation Tools; L Select A Location - Rain Bird ESP-LXIVM Series Installation, Programming & Operation Manual

Hide thumbs Also See for ESP-LXIVM Series:
Table of Contents

Advertisement

Select Location for Controller

Select a location that:
• Easily accessible and allows for comfortable viewing
• Has a fl at wall surface
• Near 120 VAC or 230/240 VAC power source (depending on
model)
• Is safe from potential vandalism
• Is outside the range of operating sprinklers
15 in.
(38,1 cm)
Cabinet depth
5.5 in (14 cm)
Depending on model
120 or 220/240 VAC
wiring in conduit
Field wiring
in conduit
Wall
Grade
Select Controller Location
106
ESP-LXIVM Series Controllers
14.32 in.
(36,4 cm)
12.69 in.
(32,2 cm)
Eye Level

Gather Installation Tools

L
Before beginning installation, gather these tools and materials:
L
Slotted head screw-
driver
L
Phillips head screw-
driver
L
Thin blade screw-
L
driver
L
Lineman's pliers
L
Torpedo level
L
Hammer
Grounding strap
L
2-Wire maxi cable
(#14 awg wire)
L
#8 Awg or #10 awg
bare ground wire
L
DBR/Y-6 connec-
L
tors
L
Tape measure
L
Wire stripper
L
Wire nuts
Marking pencil
Electric drill (or
hammer drill if
installing in
L
masonry or
concrete wall)
Waterproof caulk-
ing

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents