Commissioning; Checking The Unit; Inspection; Hermetic Sealing Of The Unit - Ingeteam Ingecon Sun Lite Series Installation Manual

Table of Contents

Advertisement

La copia, circulación o uso de este documento o de su contenido requiere un permiso por escrito. Su in-
6

Commissioning

cumplimiento será denunciado por daños y perjuicios. Todos los derechos están reservados, incluyendo
aquellos que resulten de derechos de patentes o registro del diseño.
La correspondencia del contenido del documento con el hardware ha sido comprobada. Sin embargo,
pueden existir discrepancias. No se asume ninguna responsabilidad por la concordancia total. La infor-

6.1 Checking the unit

mación que contiene este documento es revisada regularmente y es posible que se produzcan cambios
en siguientes ediciones.
This section contains instructions on how to make the unit work once correctly wired and closed.
El presente documento es susceptible de ser cambiado.
INGECON SUN LITE units manage a generating installation or part of one. The correct condition of this installation
must be checked before start-up.
Each installation is different, depending on its characteristics, the country in which it is located or other special
conditions which may apply. In any case, before starting up, it is necessary to ensure that the installation complies
with the applicable legislation and regulations and that at least the part to be started up is complete.

6.1.1 Inspection

The copy, distribution or use of this document or of its content requires written authorisation. Any
Before inverter start-up, a general inspection of the units must be carried out involving mainly:
breach thereof will be reported for damages. All rights reserved including those of patent rights or
design registration.
· Wiring check:
- Check that the cables are correctly connected to their connectors at the bottom of the housing.
The conformity of the document content with the hardware described has been checked. However,
- Check that these cables are in a good condition and that there are no hazards in their environment which damage
discrepancies may exist. Liability will not be assumed for total concordance. The information contained
them, such as sources of intense heat, objects which could cut them or arrangements which put them at risk of
impacts or pulls.
in this document is regularly revised and it is possible that there may be changes in subsequent
editions.Other functions may be available which are not covered by this document.
· Check the securing of the unit:
Check that the unit is secured firmly and is not at risk of falling.
This document may be changed.
· Isolating switch:
Check that the isolating switch is in the ON position.

6.1.2 Hermetic sealing of the unit

It must be ensured during installation operations that the unit's level of sealing has not been altered during connec-
tion of the unit.
Check the correct adjustment of the connectors and that the PG cable glands are well sealed, if these exist.
Auxiliary connections
In these connections through cable glands, give cable pipes sufficient length so that they do not pull on the internal
electrical connection terminals.
Make sure that the unused knock-outs have not been opened.
Firmly tighten the cable glands to guarantee sealing.
Display cable
If the front cover has been opened at any time, ensure that the cable to the display remains firmly connected.
Page 2
Page 38
38
Manual de instalación
Installation Manual
INGECON® SUN LITE
INGECON® SUN LITE
AAY2000IKH01
AAY2000IKI01
AAY2000IKH01
AAY2000IKI01
Rev. _B
Rev. _B
Fecha: Marzo 2011
Date: March 2011