Ingeteam INGECON SUN STORAGE 1Play 3TL Manual

Ingeteam INGECON SUN STORAGE 1Play 3TL Manual

Use and settings of the iss 1play working with pylontech force h1/h2 and powercube x1/x2
Hide thumbs Also See for INGECON SUN STORAGE 1Play 3TL:

Advertisement

INGECON SUN STORAGE 1PLAY
Use and Settings of the ISS 1Play working with PYLONTECH
FORCE H1/H2 and POWERCUBE X1/X2
Ingeteam Power Technology S. A.
Technical Guide

Advertisement

Table of Contents
loading

Summary of Contents for Ingeteam INGECON SUN STORAGE 1Play 3TL

  • Page 1 INGECON SUN STORAGE 1PLAY Use and Settings of the ISS 1Play working with PYLONTECH FORCE H1/H2 and POWERCUBE X1/X2 Ingeteam Power Technology S. A. Technical Guide...
  • Page 2: Table Of Contents

    INGECON SUN STORAGE 1Play Table of contents Introduction ............................. 3 Connecting the battery pack to the inverter ..................... 4 Wiring of CAN communication wire ....................4 Black start function..........................5 Battery´s firmware update ........................6 Setting the inverter ..........................7 DC Battery type ..........................
  • Page 3: Introduction

    INGECON SUN STORAGE 1Play 1 Introduction This document describes the process to configure the INGECON SUN STORAGE 1Play 3TL / 6TL (hereinafter, ISS 1Play) to work with PYLONTECH FORCE H1/H2 and POWERCUBE X1/X2 batteries. The PYLONTECH HV and ISS 1Play equipment can be used in the following type of single phase...
  • Page 4: Connecting The Battery Pack To The Inverter

    INGECON SUN STORAGE 1Play 2 Connecting the battery pack to the inverter The instructions to connect the battery pack to the inverter are described in the “Installation Manual of Pylontech” Please, take into account the following technical notes: 1) The inverter is turned OFF before connecting the battery pack to the inverter. 2) The battery circuit breaker is on the OFF position.
  • Page 5: Black Start Function

    INGECON SUN STORAGE 1Play 3 Black start function This chapter describes how to turn on the system when the PV energy is not available, and the battery is the only source to turn on the inverter. To do so, once all the previous steps have been completed, the following steps must be followed: 1) Make sure that the battery circuit breaker is in OFF position.
  • Page 6: Battery´s Firmware Update

    INGECON SUN STORAGE 1Play 4 Battery´s firmware update The battery´s firmware is supplied by the qualified distributor of Pylontech. To update the firmware is necessary a monitoring cable RS-232 supplied by the distributor. For further details, check the “Pylontech guideline” supplied by the distributor. A minimum firmware version is necessary to work with the Ingecon Sun Storage 1Play: Force H1/H2 V1.3...
  • Page 7: Setting The Inverter

    It is required to set the DC Battery type: Pylontech Force H1/H2 or Powercube X1/X2 This can be done using the “Ingecon Sun Manager” software package (downloadable on www.ingeteam.com) or through the display:...
  • Page 8: Final Check

    MAIN MENU > MONITORING > BATTERY MONIT. STATUS doesn´t show “BMS ERROR” Using Ingecon Sun Manager: OnLine Battery.Status doesn´t show “Error Communication with BMS” If the error is showing, check again the instructions of this guide and otherwise contact with Ingeteam Technical Service. Technical Guide 30/09/2019...
  • Page 9: Attachment I. References

    INGECON SUN STORAGE 1Play 7 Attachment I. References Commercial codes for the products indicated: Installation and Operation Manual of ISS 1Play ABH2013 Ingecon Sun Manager Software Installation Manual of PYLONTECH Force series or Powercube series Ingecon Sun Training https://www.ingeconsuntraining.info/?page_id=7049 Technical Guide 30/09/2019...

This manual is also suitable for:

Ingecon sun storage 1play 6tl

Table of Contents