Huawei FusionServer Pro 2288H V5 User Manual page 98

Hide thumbs Also See for FusionServer Pro 2288H V5:
Table of Contents

Advertisement

FusionServer Pro 2288H V5 Server
User Guide
l
1.
Issue 08 (2019-10-30)
a.
Remove the optical cable to be replaced.
b.
Connect the new optical cable.
Connect the new optical cable to the same port as the removed one.
n
Connect the optical cable to the optical module securely.
n
i.
Insert the optical module into the optical port. See (1) in
ii.
Close the latch on the optical module to secure it. See (2) in
iii. Insert the optical cable into the optical module. See (3) in
Figure 7-16 Connecting an optical cable
When you use an SFP+ cable:
Remove the SFP+ cable to be replaced.
Gently push the power connector inwards and pull the latch out to remove the SFP+
cable.
NO TICE
Do not directly pull out the latch.
Copyright © Huawei Technologies Co., Ltd.
7 Installation and Configuration
Figure
7-16.
Figure
7-16.
Figure
7-16.
90

Advertisement

Table of Contents
loading

Table of Contents