Oracle Server X6-2 Installation Manual page 62

Hide thumbs Also See for Server X6-2:
Table of Contents

Advertisement

Install the Cable Management Arm
Note -
remove the latching bracket so that you can remove connector D.
11.
Gently tug on the four CMA connection points to ensure that the CMA
connectors are fully seated before you allow the CMA to hang by its own weight.
To verify that the slide-rails and the CMA are operating properly before routing
12.
cables through the CMA:
Extend all rack anti-tilt devices to prevent the rack from tipping forward
a.
when the server is extended.
Caution -
all anti-tilt devices before extending the server from the rack.
For instructions to stabilize the rack, see
Installation" on page
b.
Slowly pull the server out of the rack until the slide-rails reach their stops.
c.
Inspect the attached cables for any binding or kinks.
62
Oracle Server X6-2 Installation Guide • July 2020
The slide-rail latching bracket has a green release tab. This tab is used to release and
To reduce the risk of personal injury, stabilize the expansion rack cabinet and extend
41.
"Stabilize the Rack for

Advertisement

Table of Contents
loading

This manual is also suitable for:

X6-2l

Table of Contents