Logistics Checklist Considerations
Is there a delivery/unpacking/staging area?
Is the delivery inside?
If the delivery is not inside, then is the site prepared for uncrating?
Is the unpacking/staging area protected from the elements?
Does the building have adequate receiving space?
Is the unpacking area air-conditioned to avoid thermal shock for
various hardware components?
Will sufficient moving personnel be available to install the
hardware?
Are you prepared for uncrating and trash removal?
Are there any restrictions on delivery and trash removal?
Are there any restrictions on delivery truck length, width or
height?
Does the customer allow cardboard boxes and other packing
material in the computer room?
Is there a time constraint on dock access? If yes, then provide time
constraints.
Is tail lift required on delivery carrier to unload the equipment at
the delivery dock?
Will any of the following be required to place equipment in
computer room?
Stair walkers
Lifters
Ramps
Steel plates
Floor covers
Does the delivery carrier require any special equipment, such as
non-floor damaging rollers, transport dollies, pallet jacks, or fork
lifts?
Related Information
"Server Physical Specifications" on page 15
Oracle Server X6-2 Safety and Compliance Guide
"Receiving and Unpacking Guidelines" on page 17
Yes
No
N/A
Comment
Preparation Checklists
Site Planning Checklists
139

Advertisement

Table of Contents
loading

This manual is also suitable for:

X6-2l

Table of Contents