FULTON Vantage VTG Series Installation And Operation Manual page 15

Condensing hydronic boilers standard, dual fuel, and low emissions models 2,000,000 - 6,000,000 btu/hr 504k - 1.5 mm kcal/hr
Hide thumbs Also See for Vantage VTG Series:
Table of Contents

Advertisement

SECTION 2
-
INITIAL RELEASE
REV
REVISION DESCRIPTION
FULTON VANTAGE
HYDRONIC CONDENSING
BOILERS
---
---
B.O.M.
ELEC. ENG MECH. ENG CHECKED
REVISION HISTORY
TEMPERATURE SENSOR
MOTORIZED ISOLATION VALVE
UNLESS OTHERWISE NOTED:
This design and
drawings are
DIMENSIONS ARE IN INCHES
TOLERANCES ON
proprietary and are the
FRACTIONS
1/4
exclusive property of
(2) PLACE DEC.
.01
The Fulton Companies.
(3) PLACE DEC.
.005
The corporation does
ANGLES
2 DEG.
not permit their use
SURFACE FINISH
except with prior
250 MICRO-INCHES
written consent.
RETURN WATER
TEMPERATURE SENSOR
HEATING HOT
WATER RETURN
The items shown in
DRAWN BY:
MECH. ENG:
this drawing may be
M. BERWALD
7/7/2014
N/A
covered by one or
more patents of The
CHECKED BY:
ELEC. ENG:
Fulton Companies.
N/A
N/A
FIGURE 3 - MULTIPLE VANTAGE BOILERS IN A COMMON HYDRONIC LOOP, PRIMARY ONLY VARIABLE FLOW ARRANGEMENT WITH
B.O.M. REVIEW
APPROVED BY:
THIRD ANGLE PROJECTION
K.BOTTORFF
N/A
1 OF 1
Note: Sample piping layout (P&ID) is a general representation of system installation. Good practice should be used in system design,
including but not limited to adequate pipe/valve sizing and natural flow path for system water.
Questions? Please Contact Your Local Manufacturer's Representative
VTG-IOM-2016-1214
---
---
B.O.M.
ELEC. ENG MECH. ENG CHECKED
REVISION HISTORY
TEMPERATURE SENSOR
MOTORIZED ISOLATION VALVE
---
---
---
APPROVED
SUPPLY WATER
RETURN WATER
TEMPERATURE SENSOR
HEATING HOT
WATER RETURN
The items shown in
DRAWN BY:
this drawing may be
M. BERWALD
7/7/2014
covered by one or
more patents of The
CHECKED BY:
Fulton Companies.
N/A
B.O.M. REVIEW
THIRD ANGLE PROJECTION
N/A
1 OF 1
CONDENSATE
DRAIN TRAP
JOB NUMBER:
PROJECT NAME:
PROJECT MANAGER:
7/7/2014
MOTORIZED ISOLATION VALVES (RECOMMENDED)
---
---
---
APPROVED
SUPPLY WATER
AIR REMOVAL
SYSTEM PUMP
WITH VARIABLE
SPEED DRIVE
EXPANSION TANK
CONDENSATE
DRAIN TRAP
REVERSE RETURN
MECH. ENG:
JOB NUMBER:
(SEE NOTE 4)
N/A
ELEC. ENG:
PROJECT NAME:
N/A
APPROVED BY:
PROJECT MANAGER:
K.BOTTORFF
7/7/2014
DESCRIPTION:
VANTAGE BOILER PRIMARY ONLY
VARIABLE FLOW PIPING DIAGRAM WITH
1" SIDE CLEARANCE
AIR REMOVAL
SYSTEM PUMP
WITH VARIABLE
SPEED DRIVE
HEATING HOT
EXPANSION TANK
WATER SUPPLY
REVERSE RETURN
(SEE NOTE 4)
DESCRIPTION:
VANTAGE BOILER PRIMARY ONLY
VARIABLE FLOW PIPING DIAGRAM WITH
1" SIDE CLEARANCE
NOTES:
1.
THIS IS A TYPICAL ARRANGEMENT FOR REFERENCE PURPOSES
ONLY. ACTUAL INSTALLATIONS MAY REQUIRE ADDITIONAL
COMPONENTS WHICH ARE NOT SHOWN FOR CLARITY.
2.
THIS DRAWING IS NOT FOR CONSTRUCTION PURPOSES.
3.
REFER TO THE INSTALLATION AND OPERATION MANUALS FOR
INFORMATION REGARDING CLEARANCES AND INSTALLATION
REQUIREMENTS.
THE PIPING CONFIGURATION SHOULD UTILIZE A REVERSE
4.
RETURN HEADER TO PROPERLY BALANCE FLOW ACROSS THE
BOILERS. WHERE REVERSE RETURN CANNOT BE USED, IT IS
RECOMMENDED TO INSTALL A BALANCING VALVE PER BOILER.
The Fulton Companies
972 Centerville Road
Pulaski, New York USA 13142
DRAWING NUMBER
G-31-100003
SHEET 1 OF 1
INSTALLATION
HEATING HOT
WATER SUPPLY
NOTES:
1.
THIS IS A TYPICAL ARRANGEMENT FOR REFER
ONLY. ACTUAL INSTALLATIONS MAY REQUIRE
COMPONENTS WHICH ARE NOT SHOWN FOR C
2.
THIS DRAWING IS NOT FOR CONSTRUCTION P
3.
REFER TO THE INSTALLATION AND OPERATIO
INFORMATION REGARDING CLEARANCES AND
REQUIREMENTS.
4.
THE PIPING CONFIGURATION SHOULD UTILIZ
RETURN HEADER TO PROPERLY BALANCE FLO
BOILERS. WHERE REVERSE RETURN CANNOT B
RECOMMENDED TO INSTALL A BALANCING VA
The Fulton Companies
972 Centerville Road
Pulaski, New York USA 13142
DRAWING NUMBER
G-31-100003
SHEET 1 OF 1
REV
-
2-9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents