FULTON Vantage VTG Series Installation And Operation Manual page 44

Condensing hydronic boilers standard, dual fuel, and low emissions models 2,000,000 - 6,000,000 btu/hr 504k - 1.5 mm kcal/hr
Hide thumbs Also See for Vantage VTG Series:
Table of Contents

Advertisement

INSTALLATION
FIGURE 21 - SIDE WALL PENETRATION DETAILS
PVC
90° ELBOW
AIR INLET
RUBBER COUPLING
(REQUIRED)
EXHAUST PIPE
WALL PENETRATION
4 ft. (122 CM)
2-38
INSTALL SUPPORT STRAP AT
5 FT / 150 CM HORIZONTAL
INTERVALS AND AT
INTERMEDIATE ELBOWS
PVC PIPE
RISE TO RUN: 1/4" PER FOOT
VANTAGE
BOILER
AIR INTAKE & EXHAUST PIPES WALL PENETRATION CLEARANCES
10 ft (3 m)
(MINIMUM)
AIR INTAKE
WALL PENETRATION
WIND DIRECTION
DO NOT PLACE INSULATION IN
REQUIRED AIR SPACE CLEARANCE
BAND SUPPORT
COLLAR
COUPLING
(TYP EACH SIDE)
COMBUSTIBLE WALL
PENETRATION DETAIL
NON-COMBUSTIBLE
WALL PENETRATION
EXHAUST
1/4" TAPPING FOR WATER
CAUTION:
AIR INTAKE AND EXHAUST TERMINATION SHOULD BE
LOCATE INTAKE
SEPARATED AS FAR AS POSSIBLE TO PREVENT FLUE GAS
UPWIND OF
EXHAUST PIPING
RECIRCULATION DURING DIFFERENT WIND CONDITIONS
VTG-IOM-2016-1214
MIN. / MAX. WALL THICKNESS
( 3 1/4 IN. - 20 IN. )
( 8.255 CM - 50.8 CM )
REQUIRED AIR
SPACE CLEARANCE
COMBUSTIBLE WALL
6 IN. / 15 CM
90° PVC ELBOW
SCREENED AIR INLET
STAINLESS STEEL
HIGH TEMPERATURE
EXHAUST PIPE & FITTINGS
WALL
TERMINATION
( WITH SCREEN )
SCREENED
TERMINATION
PARTIAL DETAIL
100 PSI MAXIMUM
© The Fulton Companies 2016
SECTION 2
WALL TERMINATION
( WITH SCREEN )
4 FT / 122 CM ( MINIMUM )
BETWEEN INLET & EXHAUST
OPENING ( SEE BELOW )
AIR INTAKE AND EXHAUST
TERMINATION SHOULD BE
SEPERATED AS FAR AS
POSSIBLE TO PREVENT FLUE
GAS RECIRCULATION DURING
DIFFERENT WIND CONDITIONS.
OPENING 1 FT / 30 CM ( MIN )
ABOVE NORMALLY EXPECTED
SNOW ACCUMULATION LEVEL
OPENING 1 FT / 30 CM ( MIN )
ABOVE NORMALLY EXPECTED
SNOW ACCUMULATION LEVEL