FULTON Vantage VTG Series Installation And Operation Manual page 147

Condensing hydronic boilers standard, dual fuel, and low emissions models 2,000,000 - 6,000,000 btu/hr 504k - 1.5 mm kcal/hr
Hide thumbs Also See for Vantage VTG Series:
Table of Contents

Advertisement

2-35-001039
1/2" x 1/4" PVC Reducing Bushing
2-45-000247
4" Watertight Round Box
2-45-000248
4" Watertight Round Box Cover
4-30-000510
Hydronic Sensor Kit
2-40-000819
4" RTD Low Temperature
2-40-000838
4" RTD High Temperature
2-35-000262
1/2" x 1/4" Reducing Bushing
2-30-000923
Thermowell 2 1/2" Insertion
2-40-000323
Heat Conducting Compound
2-40-000856
Surface Mount RTD
2-23-000815
Surface Mount Epoxy
2-40-000996
0-30 psi Pressure Transducer
2-40-000999
0-100 psi Pressure Transducer
2-40-000994
0-200 psi Pressure Transducer
2-35-000518
Brass siphon loop (pigtail)
2-35-000210
1/4" Coupling
2-40-001009
Pressure Transducer Cable (10 meters)
Miscellaneous
2-45-880360
120VAC Relay and base (Slim)
2-45-880400
24VDC Relay and base (Slim)
2-45-000483
10Amp Circuit Breaker
2-40-000795
Black Push Button
2-45-000918
120VAC Alarm Horn
2-45-000489
24VDC Control Relay (Ice Cube)
2-40-000131
120VAC Control Relay (Ice Cube)
2-40-000096
Relay Base
2-45-000022
3 Position Switch
2-45-000309
2 Position Switch
2-40-000715
24VAC Transformer/Power Supply
2-40-000334
Honeywell Resistor Kit
2-45-000595
Hawkeye Current Sensing Switch
2-45-001040
24VDC Power Supply
Questions? Call (315) 298-8510, or visit us online at www.fulton.com
56

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents