FULTON FB-S series Installation, Operation & Maintenance Manual
FULTON FB-S series Installation, Operation & Maintenance Manual

FULTON FB-S series Installation, Operation & Maintenance Manual

Advertisement

FULTON BOILER
FB-S SERIES
INSTALLATION, OPERATION & MAINTENANCE MANUAL

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the FB-S series and is the answer not in the manual?

Questions and answers

Summary of Contents for FULTON FB-S series

  • Page 1 FULTON BOILER FB-S SERIES INSTALLATION, OPERATION & MAINTENANCE MANUAL...
  • Page 2 These instructions must not be considered as a complete code of practice, nor should they replace existing codes or standards which may be applicable. The requirements and instructions contained in this section generally relate to the standard Fulton boiler model FBS. When installing a packaged unit, this entire section should be read to ensure that the installation work is carried out correctly.
  • Page 3 Fulton Boiler FBS Series CONTENT Safety Warnings & Precautions Description & Introductions General Specifications & Dimensions Installation Locating the Boiler Boiler room ventilation Flue and chimney requirements Water supply Valves Electrical Requirements Gas Supply Oil Supply Installation check points Cleaning Boil-out of new unit Controls &...
  • Page 4: Safety Warnings And Precautions

    Fulton Boiler FBS Series SECTION Safety warnings & Precautions The following WARNINGS, CAUTIONS, and NOTES appear in various chapters of this manual. They are repeated on these safety summary pages as an example and for emphasis. WARNINGS must be observed to prevent serious injury, or death to personal.
  • Page 5 Description & Introductions General Fulton boiler standard FB-S model is a three-pass, wet back, and corrugated furnace design steam boiler. In the first pass, the flame and high temperature flue gas flows from the front to the back of the furnace;...
  • Page 6: Specifications

    Note: 1) All steam output (kg/hr) ratings from 0 MPa at 100 , fuel consumption based on light oil 1,1200 Kcal/kg, heavy oil 10,960 kcal/kg, nature gas 8,900 kcal/m , town gas 3600kcal/m 2) Specification and dimensions are approximate, the Fulton Companied reserve the right to change specifications or dimensions. Connection Model FB-S 1-1.0...
  • Page 7: Locating The Boiler

    Fulton Boiler FBS Series Section Installation General NOTE It is essential that the installing shall be undertaken only by suitably qualified and experienced personnel. And it should comply with appropriate Codes and Standards. Locating the Boiler A) The boiler should be closed in dry surroundings on a level base, making sure that there is sufficient room around the boiler to enable the operator and/ or the maintenance engineer to gain access to all parts of the boiler.
  • Page 8: Flue And Chimney Requirements

    Fulton Boiler FBS Series Recommended minimum opening Model FB-S 1-1.0 1.5-1.0 2-1.0 3-1.0 4-1.0 4-1.25 6-1.25 Minimum area (m Be sure total BHP= proper make up air opening size. For instance if you have three 300 BHP boilers, it is a total BHP of 900, and the 900 BHP make up air opening size is recommended.
  • Page 9 The Fulton warranty does not cover damage or failure that can be attributed to corrosion, scale or dirt accumulations. Oxygen is a corrosive. See the warranty section of this manual for full details.
  • Page 10: Electrical Requirements

    D) Water level gauge Two plate water level gauges are equipped to Fulton boiler FB-S model. Boiler operator can see the water level in side the boiler from these gauges. Both of them are connected to a 1/4” copper pipe which drain water can flow through to assistant pipework.
  • Page 11: Oil Supply

    It is essential that the installation of the gas pipework must be undertaken only by suitably qualified and experienced personnel and in compliance with appropriate Codes and Standards. Fulton Companies can accept no responsibility for consequential loss, damage or personal injury which results from a failure to follow the manual.
  • Page 12: Steam Piping

    Fulton Boiler FBS Series Cleaning A STEAM PIPING Steam and water piping systems connected to the boiler may contain oil, grease, or foreign matter. The impurities must be removed in order to prevent damage to pressure vessel heating surfaces. On a steam system, the condensate should be wasted until tests show the elimination of undesirable impurities.
  • Page 13 Fulton Boiler FBS Series Boil-out of New Unit The internal surfaces of a newly installed boiler may have oil, grease or other protective coatings used in manufacturing. Such coatings must be removed because they lower the heat transfer rate and could cause over-heating of a tube. Before boiling out procedures may begin, the burner should be ready for firing.
  • Page 14: Washing Out

    Fulton Boiler FBS Series until the water is heated to at least 180 to drive off any dissolved gases, which might otherwise ¨ corrode the metal. The above procedure may be omitted in the case of a unit previously used or known to be internally clean.
  • Page 15: Boiler Control Panel

    Fulton Boiler FBS Series Section Controls & Burner The following brief description of the fittings and controls used on the FB-S boiler is intended to provide the operator with a basic understanding of the operating principles, which is essential for the continued efficient use of the boiler.
  • Page 16: Oil Burner

    High Pressure Indicator (when fitted). This lamp is not wired when high steam pressure alarm/lamp is provided in the boiler control panel. 2. Burner Fulton boiler FB-S model can mounted with gas burner, oil burner or dual fuel burner on customer’s requests. OIL BURNER The fuel for the oil burner is from No.2 to No.6 oil.
  • Page 17: Gas Burner

    Fulton Boiler FBS Series controls the combustion air entering the burner on the requirement of the boiler heating during operating. The standard servomotor of the oil burner is Landis & Staefa STM6 with 5 cam motor. A fully closed position is provided to prevent air flowing through the appliance when the burner is not in operation.
  • Page 18 Fulton Boiler FBS Series 4) Valve Proving System. A valve proving system, as show schematically below, is standard on the boilers from FB-S3-1.0 to FB-S6-1.25 model. When the boiler operating sequence is initiated, the burner control box energizes the proving system, which then carries out the following checks.
  • Page 19: Burner Operating Sequence

    Fulton Boiler FBS Series BURNER OPERATING SEQUENCE The burner operating sequence begins with a pre-purge period on full air. Fuel is then supplied to the burner at start rate and ignition initiated. Start flame proving is followed by establishment of the main flame.
  • Page 20: Filling The Boiler

    Fulton Boiler FBS Series Section Operating Boiler starting Stop! Make sure you have read any followed all previous safety information. Check with local authorities where approval for start-up is required. In some localities, final inspection of services may be required.
  • Page 21: Practical Considerations

    Fulton Boiler FBS Series NOTE Before leaving the boiler unattended, the daily operating tests should be carried out to check the functions of all the safety interlocks. For more detailed information on the burner firing sequence consult the burner manufacture’s Operation and Maintenance instructions.
  • Page 22 Fulton Boiler FBS Series 3. DAILY OPERATING TESTS CAUTION If any of the following tests fail to function as described, shut down the boiler immediately and consult the factory. With the burner firing, carry out the following tests: NOTE Ensure the correct water level is maintained during pressure build up. If any part of the equipment is not operating correctly, the fault should be investigated before the boiler is used.
  • Page 23 Fulton Boiler FBS Series To reduce the possible down time and loss of pressure to steam, load the tests detailed can be accomplished by isolating the feed pump using the pump ON/OFF switch on the boiler control panel. Allowing the water level to fall by evaporating steam to the system.
  • Page 24: Evaporation Test

    (l) Feed pump is primed and not air locked. (m) Front door proof of closure microswitch is closed. Before contacting the Fulton Service Department, have the following information available: (a) The model and size of the boiler. (b) The boiler serial No.
  • Page 25 Fulton Boiler FBS Series NOTE A very common problem is that when a boiler cools down, the steam in the steam space condenses and gradually forms a vacuum. If the feedwater line is open, the boiler will draw in water in an attempt to equalize the pressure. The appearance in the water level gauges is the same if they are empty or fully flooded.
  • Page 26 Fulton Boiler FBS Series 4. Flame detector defective, sight tube obstructed or lens dirty. Pilot flame, no main flame 5. Insufficient or no voltage at main fuel valve circuit terminal. 1.Pressure or temperature above modulating control setting. Burner stays in low fire 2.Manual-automatic switch in wrong position.
  • Page 27: Maintenance

    Fulton Boiler FBS Series Section Maintenance GENERAL To ensure the continuing efficiency of the boiler, regularly carry out regular routine maintenance procedures as detailed below. IMPORTANT If any fault is found during these procedures, shut down the boiler immediately and consult Fulton China LLC.
  • Page 28 The standard Fulton service kit includes replacement ceramic fibre log material 50*50*150 mm which must be glued in place with the adhesive supplied. It is vital the material is fitted ensuring the ends of the fibre face into the centre of the boiler.
  • Page 29 Fulton Boiler FBS Series FITTING NEW GASKET General CAUTION TOPOG-E gasket have a finite life after installation and must be renewed annually. It is important that the instructions given in this section are adhere to. The boilers are fitted with TOPOG-E gaskets in all the inspection holes of the boiler. These gaskets work very well and millions have been safely used over the last 30 years, however, it is absolutely essential to observe a few simple rules in order to get the best performance from your installation.
  • Page 30 Fulton China LLC shall in no event be liable for a consequential or incidental damages arising in any way, including but not limited to any loss of profits or loss of business, even if Fulton China LLC has been advised of the possibility of such damages.

Table of Contents