FULTON Vantage VTG Series Installation And Operation Manual page 16

Condensing hydronic boilers standard, dual fuel, and low emissions models 2,000,000 - 6,000,000 btu/hr 504k - 1.5 mm kcal/hr
Hide thumbs Also See for Vantage VTG Series:
Table of Contents

Advertisement

INSTALLATION
-
INITIAL RELEASE
REV
REVISION DESCRIPTION
FULTON VANTAGE
HYDRONIC CONDENSING BOILERS
---
---
---
B.O.M.
ELEC. ENG MECH. ENG CHECKED
REVISION HISTORY
HEATING HOT
WATER SUPPLY
This design and
The items shown in
UNLESS OTHERWISE NOTED:
this drawing may be
drawings are
DIMENSIONS ARE IN INCHES
TOLERANCES ON
covered by one or
proprietary and are the
FRACTIONS
1/4
more patents of The
exclusive property of
(2) PLACE DEC.
.01
Fulton Companies.
The Fulton Companies.
(3) PLACE DEC.
.005
The corporation does
ANGLES
2 DEG.
not permit their use
SURFACE FINISH
except with prior
250 MICRO-INCHES
written consent.
THIRD ANGLE PROJECTION
BOILER (PRIMARY)
CONDENSATE DRAIN
DRAWN BY:
MECH. ENG:
M. BERWALD
7/7/2014
N/A
CHECKED BY:
ELEC. ENG:
N/A
N/A
FIGURE 4 - MULTIPLE VANTAGE BOILERS IN A COMMON HYDRONIC LOOP, PRIMARY-SECONDARY FLOW ARRANGEMENT
B.O.M. REVIEW
APPROVED BY:
K.BOTTORFF
N/A
1 OF 1
Note: Sample piping layout (P&ID) is a general representation of system installation. Good practice should be used in system design,
including but not limited to adequate pipe/valve sizing and natural flow path for system water.
2-10
---
---
B.O.M.
ELEC. ENG MECH. ENG CHECKED
REVISION HISTORY
HEATING HOT
WATER SUPPLY
---
---
APPROVED
SYSTEM (SECONDARY)
PUMP WITH VARIABLE
SPEED DRIVE
BOILER (PRIMARY)
CONDENSATE DRAIN
DRAWN BY:
MECH. ENG:
M. BERWALD
7/7/2014
N/A
CHECKED BY:
ELEC. ENG:
N/A
N/A
B.O.M. REVIEW
APPROVED BY:
K.BOTTORFF
N/A
1 OF 1
PUMP
TRAP
JOB NUMBER:
PROJECT NAME:
PROJECT MANAGER:
7/7/2014
---
---
---
APPROVED
SYSTEM (SECONDARY)
PUMP WITH VARIABLE
SPEED DRIVE
SUPPLY WATER
TEMPERATURE SENSOR
HEATING HOT
WATER RETURN
REVERSE RETURN
PUMP
(SEE NOTE 4)
TRAP
JOB NUMBER:
PROJECT NAME:
PROJECT MANAGER:
7/7/2014
DESCRIPTION:
VANTAGE BOILER PRIMARY-SECONDARY
PIPING DIAGRAM WITH 1" SIDE
CLEARANCE
SHEET 1 OF 1
VTG-IOM-2016-1214
SUPPLY WATER
TEMPERATURE SENSOR
HEATING HOT
WATER RETURN
REVERSE RETURN
(SEE NOTE 4)
EXPANSION TANK
SEE NOTE 5
RETURN WATER
TEMPERATURE SENSOR
DESCRIPTION:
VANTAGE BOILER PRIMARY-SECONDARY
PIPING DIAGRAM WITH 1" SIDE
CLEARANCE
NOTES:
1.
THIS IS A TYPICAL ARRANGEMENT FOR REFERENCE PURPOSES
ONLY. ACTUAL INSTALLATIONS MAY REQUIRE ADDITIONAL
COMPONENTS WHICH ARE NOT SHOWN FOR CLARITY.
2.
THIS DRAWING IS NOT FOR CONSTRUCTION PURPOSES.
3.
REFER TO THE INSTALLATION AND OPERATION MANUALS FOR
INFORMATION REGARDING CLEARANCES AND INSTALLATION
REQUIREMENTS.
4.
THE PIPING CONFIGURATION SHOULD UTILIZE A REVERSE
RETURN HEADER TO PROPERLY BALANCE FLOW ACROSS THE
BOILERS. WHERE REVERSE RETURN CANNOT BE USED, IT IS
RECOMMENDED TO INSTALL A BALANCING VALVE PER BOILER.
5.
CENTER TO CENTER DISTANCE BETWEEN BOILER (PRIMARY)
SUPPLY AND RETURN MANIFOLDS SHOULD BE 4 PIPE
DIAMETERS OR LESS.
The Fulton Companies
972 Centerville Road
Pulaski, New York USA 13142
DRAWING NUMBER
G-31-100004
SECTION 2
EXPANSION TANK
SEE NOTE 5
RETURN WATER
TEMPERATURE SENSOR
NOTES:
THIS IS A TYPICAL ARRANGEMENT FOR REFERENCE PURPOS
1.
ONLY. ACTUAL INSTALLATIONS MAY REQUIRE ADDITIONAL
COMPONENTS WHICH ARE NOT SHOWN FOR CLARITY.
2.
THIS DRAWING IS NOT FOR CONSTRUCTION PURPOSES.
3.
REFER TO THE INSTALLATION AND OPERATION MANUALS FO
INFORMATION REGARDING CLEARANCES AND INSTALLATION
REQUIREMENTS.
4.
THE PIPING CONFIGURATION SHOULD UTILIZE A REVERSE
RETURN HEADER TO PROPERLY BALANCE FLOW ACROSS THE
BOILERS. WHERE REVERSE RETURN CANNOT BE USED, IT IS
RECOMMENDED TO INSTALL A BALANCING VALVE PER BOILE
5.
CENTER TO CENTER DISTANCE BETWEEN BOILER (PRIMARY)
SUPPLY AND RETURN MANIFOLDS SHOULD BE 4 PIPE
DIAMETERS OR LESS.
The Fulton Companies
972 Centerville Road
Pulaski, New York USA 13142
DRAWING NUMBER
G-31-100004
SHEET 1 OF 1
REV
-
© The Fulton Companies 2016
REV
-

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents