FULTON Vantage VTG Series Installation And Operation Manual page 24

Condensing hydronic boilers standard, dual fuel, and low emissions models 2,000,000 - 6,000,000 btu/hr 504k - 1.5 mm kcal/hr
Hide thumbs Also See for Vantage VTG Series:
Table of Contents

Advertisement

INSTALLATION
Figure 6 Notes:
ƒ Header must be level or slightly pitched toward the drain.
ƒ Header material to be galvanized steel or 316L stainless.
ƒ Header should be taken to the lowest point possible and
at least 5.5 inch (14.2 cm) drop from 1.5 inch (38.1 mm)
condensate drain kit/trap outlet.
ƒ 1.5 inch (38.1 mm) condensate drain kit/trap outlet is never
to be above 1 inch boiler condensate outlet.
ƒ For multiple boiler installation, maintain a minimum pipe
size of 1 inch (25.4 mm) for the header piping.
ƒ The maximum number of units to attach per condensate
drain kit is 12mm BTU total.
2-18
FIGURE 6 - CONDENSATE DRAIN PIPING FOR MULTIPLE VANTAGE BOILERS
REAR VIEW
VTG-IOM-2016-1214
DETAIL A
CONDENSATE
DRAIN KIT
© The Fulton Companies 2016
SECTION 2
DETAIL A

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents