Checks To Make Before Installation; Checking The Power Supply; Checking The Installation Space - Canon Paper Deck-AF1 Service Manual

Table of Contents

Advertisement

5
Installation > Checks to Make before Installation > Checking the Installation Space

Checks to Make before Installation

Requirements for the installation place are given below.
It is recommended to look over the place to be used for installation before delivering the
equipment to the user.

Checking the Power Supply

The machine must be connectable the outlet that can supply the rated voltage +10/-15% at
the specified ampere or higher.
120V 15A
230V 10A
Caution
The socket-outlet shall be installed near the equipment and shall be easily accessible.
5
Installation > Checks to Make before Installation > Checking the Installation Space

Checking the Installation Space

1.The minimum space required for installation and maintenance is shown below.
1000mm or more
1000mm
or more
1320mm
1000mm or more
Pallet
1150mm
950mm
1150mm
Paper Deck
Slope plates
1060mm
990mm
3200mm
F-5-2
F-5-2
3
3

Advertisement

Table of Contents
loading

Table of Contents