Checking Before Installation
Checking Before Installation
When installing this equipment together with the finisher, install this equipment before installing the finisher to the upstream
connection machine.
Check Items when Turning OFF the Main Power
Check that the main power switch is OFF.
1. Turn OFF the main power switch of the host machine.
2. Be sure that Control Panel Display and Main Power Lamp are both turned OFF, and then disconnect the power plug.
Product Name
Safety regulations require the product's name to be registered. In some regions where this product is sold, the following name
may be registered instead.
• F281060
Installation Outline Drawing
52
6. Installation