Installing the isCon® system
30 | EN
Fig 20: Cutting the insulation
5 2
Mounting the connection elements isCon connect,
isCon con 2 and isCon con PRE
Using the screw-on connection element isCon connect, isCon con 2 and
isCon con PRE, you can connect OBO isCon
systems, e.g. to the insulated OBO isFang air-termination rod system or
to a separate ring conductor or earthing system using a connection ter-
minal. At the same time, an electrical connection is created between the
copper core and the black, weakly conductive layer or protective jacket
of the isCon
conductor. The grub screws in the connection element are
®
pre-coated with a reactive screw lock made of two components. The com-
ponents of the coating react automatically on turning in and stick down
the grub screws. If the screws are released once more, the components
are separated again and the grub screws are locked again the next time
they are screwed in. The screw lock is fully hardened after six hours.
Scope of delivery (per packaging unit): 2 connection elements, 2
heat-shrinkable sleeves, Allen key.
Remove the two grub screws from the connection element using the
Allen key.
Fig 21: Removing the grub screws
Free the front area of the black, weakly conductive layer or protective
jacket from impurities and grease (e.g. OBO art. no. 5408 060).