Fig 22: Using a cleaning cloth
Using a fork wrench (WAF 19 mm), screw the connection element onto
the isCon
®
the two screw holes.
Fig 23: Screwing on the connection element
Tighten both grub screws with approx. 10 Nm.
Fig 24: Tightening the grub screws
Pull the heat-shrinkable sleeve on in such a way that the connection
element and conductor transition are enclosed completely. Using
a gas torch or hot air at approx. 120 °C, shrink the heat-shrinkable
sleeve and let it cool.
lightning protection
®
Installing the isCon® system
isCon EPPA 004
conductor, until the copper core can be seen completely in
19 mm
o n
i s C
10 Nm
EN | 31