Switch on the hydraulic unit and set the desired pressure using the pressure
control valve.
Recommended pressure:
MRS: 80 to 120 bar
BRS: 80 to 120 bar
NOTE: The stamping pressure required is dependent on the size and manufacturing
tolerances. Individual cases may require that a higher pressure is used. Begin with
minimal pressure and increase it gradually in accordance with installation results.
ATTENTION!
Risk of material damage posed by exceeding the permissible
operating pressure!
Plugs/tool may be destroyed.
• Under no circumstances exceed the hydraulic cylinder's permissible
operating pressure of 350 bar.
6.
Briefly operate the one-handed control panel to activate the hydraulic cylinder.
Ș
You will hear a clear clicking sound.
7.
Immediately release the hydraulic cylinder's power switch.
Ș
The hydraulic cylinder will return to its initial position.
8.
Slide the assembly tool to one side.
Ș
Plug has been pre-pressed with a protrusion of approx. 0.2 - 0.3 mm above the
rail surface.
9.
Remove any swarf caused by the pressing procedure or clear with a suitable tool
(scalpel, sharp knife, etc.).
Ensure that plugs and rails are not scratched.
10. Blast loose swarf from the rail surface using compressed air. If necessary, clear
remaining swarf using a brass brush. Check that all swarf has been removed.
35