Installing Monorail Bz - Schneeberger MONORAIL Series Mounting Instructions

Profiled linear guideways and integrated measuring systems
Table of Contents

Advertisement

6
 Installation
6.7
Installing MONORAIL BZ
Fig.47
Install the system in accordance with the following steps:
1.
Remove loosely packed parts and uninstalled cover strips from the transport crate.
2.
Lift the BZ out of the transport crate by hand or using a suitable lifting device
supplied by the customer.
3.
Lift the BZ horizontally.
4.
Transport the BZ to the prepared installation location.
5.
Remove the protective film and clean the locating side and cog tips.
6.
Lift the BZ into the installation position.
7.
Fasten the BZ to the installation point with screws:
a) Pass the screws through the large holes of the profile (1).
b) Lightly tighten the screws.
8.
Loosen the aluminium profile:
a) Loosen the clamping elements (2) (do not completely unscrew the screws).
b) Remove the profile with clamping elements.
9.
Lightly tighten the remaining screws to secure the BZ to the machine.
10. Align the BZ.
11. Tighten the screws using the specified torque (see „12.2 Screw tightening torques"
on page 73).
Tighten the screws progressively from one side or from the middle.
12. Where required, seal screw counterbores with BRK plugs (see „7.2.1 MRK/BRK
plastic plugs" on page 31).
29

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents