Assemble And Install Roof Vents - STC Easy2Build Easy-Grow Assembly Instructions Manual

8’ x 10’ greenhouse
Hide thumbs Also See for Easy2Build Easy-Grow:
Table of Contents

Advertisement

Assemble and Install Roof Vents

Place all the parts for both roof vents and handles on a level surface.
Make sure the pieces are in the correct positions before assembling.
!
Carefully follow the order of assembly to ensure an easy installation.
Wear proper safety gear including work shoes, gloves and goggles.
!
The roof vents are assembled with the outside face to the ground. ALL VIEWS
ARE SHOWN FROM INSIDE. Assemble BOTH vents rst and then add the handles.
IMPORTANT: This greenhouse is equipped with one MANUAL vent handle (S25 installed in step10.3) and one
AUTOMATIC vent handle (auto vent opener installed in step 10.10). The auto vent opener is packed separately.
Remove protective plastic from both sides of panels Y24. Place side to face toward the sun facing
10.1
down. Fit panels into channels of pro les L10A and L11A.
L11A
10.2A
Fit panel and pro les L10A and L11A into channels of pro les L12B. Make sure holes in
ends of pro les line up.
L11A
NOTE: ALL VIEWS ARE FROM INSIDE.
Screw
Pro le
QTY
#S26
8
Attach handle S25 to pro le L10A with two S24 screws. NOTE: You will
10.3
install the handle to the second vent in step 10.10.
www.stcny.com
!
10.2B
L10A
Pro le
QTY
#L12B
4
#L10A
S25
IMPORTANT: hollow side of handle
S25 faces down when attached.
S24
S24
46 of 57
Remove protective plastic from EACH side of poly carbonate
panels before installing. Dispose of plastic properly. Install with
side labeled "Face this side towards the sun" FACING DOWN.
L10A
Secure with four
S26 screws.
S26
S26
Pro le
QTY
2
#L11A
Handle
#S25
S26
S26
S26
L12B
L10A
S26
Panel
QTY
QTY
2
#Y24
2
S25
S24
S24
L10A
Screw
QTY
QTY
1
#S24
2

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Easy2Build Easy-Grow and is the answer not in the manual?

Table of Contents